The Cost of Reliable Power
Compare electricity costs, explore study results and test your own assumptions.
Why this matters
This resource sets out the assumptions behind energy costs. Solar, wind and battery costs have fallen over the long term. CSIRO’s latest Australian estimates also show falling battery costs and rising nuclear capital costs. If those trends continue, the cost gap could widen.
Time is money. If an alternative can deliver power sooner, a longer project can mean years of delayed savings and emissions reductions. The comparison below shows how the timelines can differ and explains the scope of the cost studies.
What does waiting cost?
Compare an Australian renewables mix with nuclear, using the same upfront budget and adjustable build times.
Choose a nuclear timeline
Global: 63 reactors, 2016–2025; construction only. Costs remain Australian.
Estimated electricity by year 25
Australian capital costs · Global average timelineThe renewable mix assumes access to existing hydro. Nuclear is plant only. Grid, nuclear backup, financing, operating, replacement and first-project costs are excluded; equal reliability is not established.
Assumptions, first-project delays & sources
How the renewable illustration works: A published UNSW-linked model used 2020 hourly weather and demand with electrification and 70% daytime EV charging. Its no-V2G portfolio had 37.2 GW rooftop solar, 30.2 GW utility solar, 44.8 GW wind, 16.4 GW / 131 GWh of eight-hour batteries, plus 5 GW hydro and 1.7 GW pumped hydro, serving approximately 223.8 TWh of annual demand. The paper applies a 0.002% annual unserved-energy standard; this does not guarantee future reliability. Batteries shift energy, they do not create it.
We reprice solar, wind and batteries using separate CSIRO 2025 Australian capital inputs: rooftop A$1,216/kW, utility solar A$1,621/kW, wind A$3,248/kW and eight-hour batteries A$308/kWh, a total of about A$280.0bn for the full model mix. We then scale the entire mix, its assumed access to existing hydro and annual electricity served in proportion to the selected budget. Hydro, pumped hydro and grid costs are excluded. Rooftop and utility solar capacity rating and location differences are not modelled. This scaling and repricing is our illustration, not a cost estimate published by either study.
Timing and nuclear: Renewables output is assumed to ramp up evenly over the selected rollout and then repeats the same annual output each year. Nuclear capacity uses A$10,332/kW and output assumes CSIRO’s 53–89% capacity-factor range once operating. It starts all at once at the chosen year. Both are simplified illustrations, not project forecasts. Fractional nuclear plants are not buildable; financing, operating costs, nuclear support and first-of-a-kind premiums are excluded. The renewable and nuclear options do not have matching system boundaries or demonstrated equal reliability.
Why first projects take longer: A new nuclear country must prepare legislation, regulators, sites, workers and financing as well as build a plant. Poland’s first-unit target shifted from 2033 in its 2020 programme to 2036, still a target. The EU recorded a preliminary PLN 192bn project estimate and substantial uncertainty; a final construction overrun is not yet known. CSIRO says Australia needs at least 15 years after legal restrictions are removed and could face a first-of-a-kind cost premium. Similar risks do not make a Polish outcome inevitable in Australia.
Study comparisons: CSIRO’s 2024 estimate was 1.5–2.5 times the cost per MWh for large nuclear generation versus firmed renewables; 2.5 is the upper end. This is not a finding about equal upfront budgets. Lund et al.’s integrated Danish system compares roughly €45–50/MWh renewables with €100/MWh nuclear, read from Figure 4; it uses Danish assumptions, including flexible demand, hydrogen and backup. These study results do not set this Australian capital-budget calculation.
Timelines: Global and China are construction averages for reactors completed in 2016–2025 and exclude planning and licensing. Poland’s 22 years is from the 2014 programme to the current 2036 target, not completed construction. Australia is CSIRO’s 15-year minimum after legal change. The selected timeline changes start time, not the Australian unit costs. These starting points differ.
- Rey-Costa et al. renewable-system study; CSIRO GenCost 2025–26, Appendix B.
- CSIRO 2024 cost statement; Lund et al. 2026, Figure 4.
- CSIRO: Australian nuclear time and first-project costs; Poland’s 2020 programme; Poland’s 2036 target; European Commission project cost analysis; World Nuclear Industry Status Report 2026.
Interactive calculator
Compare electricity costs
Choose a comparison, then move the sliders or enter your own costs.
1. Choose a comparison
Denmark: renewable mix and nuclear, including modelled integration costs. Approximate study figures.
What is included in this comparison?
Denmark: starting figures are approximate readings from Figure 4, in euros per MWh at around 2020–2022 price levels. Future integrated energy system.
Lund compares a renewable mix and nuclear within the same future Danish energy system. Both estimates include modelled integration costs; transmission is measured relative to a nuclear benchmark, not as a full network bill. The model uses 5% for all technologies and represents the effect of an 8% nuclear rate through a higher nuclear capital cost.
Reading the units: 1 MWh = 1,000 kWh. €100/MWh equals 10 euro cents/kWh. These estimates are not household electricity bills.
2. Try your assumptions
Move a slider or type a cost. Results update instantly.
Technology cost plus modelled integration costs.
Technology cost plus modelled integration costs.
Optional: explore system costs
Example only, not CSIRO costs.
3. See the comparison
Why does the nuclear grid cost only A$152.10/MWh?
That is CSIRO’s average for the entire grid, with nuclear providing about 5% of generation. It is not the cost of nuclear power itself. CSIRO separately estimates a 2050 large nuclear plant at A$183–323/MWh before additional system costs. The A$253/MWh midpoint is a plant-level estimate, not a nuclear-only system result. CSIRO’s earlier 2024 estimate of 1.5 to 2.5 times compared nuclear generation costs with firmed renewables, not two grid-wide averages.
The difference below compares the first two scenarios only.
Renewable mix is lower by €55/MWh (55%) in this arithmetic scenario. Nuclear is about 2.2 times the renewable estimate.
Add your own comparison
Enter a total cost for another scenario in the same currency, price year and system boundary. It should represent comparable reliability and coverage. Your figure is an assumption, not a study estimate.
Your custom comparison is included when you share. It is cleared when you change studies or reset.
Adjust storage, grid and other assumptions
The sliders change the starting costs above. Use the boxes for extra changes per MWh. Switching studies resets cost assumptions; electricity output stays the same.
How this calculator works: scenario cost = starting figure × multiplier + your per-MWh adjustments. It is an arithmetic sensitivity tool, not a re-run of either research model. It does not recalculate weather, dispatch, reliability, capacity needs or the technology mix. Costs already in a study baseline must not be added again as if they were missing.
Compare annual costs for the same output
Compare the same electricity output
Choose the average electricity generated for both options. This is output over time, not the installed capacity of a power station.
Slider: 0.1–10 GW. Enter 0.01–1,000 GW in the box for other scales.
8.76 TWh (8,760,000 MWh) per year at this average output.
This changes the nuclear starting cost above, before its multiplier. Add assumed system costs above.
The renewable mix is €481.8 million / year (55%) lower than the nuclear estimate.
Each per-MWh figure is multiplied by the same annual output. The percentage difference is measured against the higher cost. These indicative annual amounts inherit the study’s currency, price year and system boundary. They are not a new system model, lifetime construction costs or electricity bills. The calculation does not model reliability, losses or construction delays.
The price of a working system
A power station’s cost is only part of the picture. A reliable electricity system also needs networks and ways to balance supply and demand, such as storage and backup.
This calculator brings together Australian and Danish research. Choose a study, explore its starting figures and change the assumptions to see how the arithmetic responds.
The research behind the calculator
Two studies, two perspectives
Australia · July 2026
CSIRO and AEMO: GenCost
An annual Australian report that models the costs of a reliable electricity mix, including storage and new transmission. The draft went through public stakeholder consultation before the final report.
Denmark · June 2026
Lund and colleagues: SLCOE
A peer-reviewed paper in Energy examining the cost of different technologies and their integration in a future Danish energy system, including flexible transport, heating and industry.
Understanding the numbers
What does SLCOE mean?
System levelised cost of electricity (SLCOE) looks beyond the cost of producing electricity at one plant to consider the wider system needed to use that electricity. The exact definition and boundary depend on the study.
1. Generation
Building and operating the wind farms, solar plants, reactors and other generators that produce electricity, including maintenance costs.
2. Flexibility
Storage, flexible demand, backup and reserves help balance supply and demand as conditions change throughout the day and across the seasons.
3. Networks
Transmission and related infrastructure connect generation and demand. Both studies include transmission, within their own model boundaries.
System-level analysis asks what the wider configuration needs to deliver and balance electricity.
Every technology interacts with the rest of the system. Wind and solar output varies with weather; nuclear plants need maintenance and backup for outages. The best mix depends on local resources, demand, technology costs and available flexibility.
Why are power bills still high?
System costs are not household bills. This calculator compares modelled system costs, or a nuclear plant cost with your own assumptions. System figures already include some storage and transmission costs, so adding the same costs again would double count them. A household bill includes other charges too.
How wholesale pricing works. In Australia’s National Electricity Market, AEMO balances supply and demand every five minutes. In a simplified market, the bid for the last supply needed helps set the regional spot price. This is called marginal pricing.
An example. Imagine wind is offered at A$20/MWh and a gas generator offering A$120/MWh is the last supply needed. The spot price would be about A$120/MWh for that interval. Dispatched generators generally receive the regional price, adjusted for losses; their contracts affect what they ultimately earn. Real prices also reflect network constraints and bidding.
Where renewables and batteries help. Wind and solar cost money to build, connect and maintain, but do not need fuel. When their output displaces higher-priced offers, wholesale prices can fall. Batteries and flexible demand can help shift energy into more expensive hours, although storage and networks also have costs.
Why the saving is not immediate. Retailers use wholesale contracts as well as the spot market. Bills also include local poles and wires, retailer costs, policy costs and fixed daily charges. Lower wholesale prices therefore do not flow through to bills immediately or dollar for dollar. Your plan and how much electricity you use also matter.
What is already happening? The Australian Energy Regulator reported that wholesale prices fell across all NEM regions in 2025, with fewer extreme price events and growing wind, solar and battery supply helping ease pressure.
Will more renewables lower bills? In its 2025 outlook, the Australian Energy Market Commission projected inflation-adjusted average residential electricity prices across the NEM would fall towards 2030 as new renewables were built, then rise later under its assumptions as supply growth failed to keep pace with demand. A faster build-out and more flexibility could ease that pressure. These are projections, not promises.
More low-cost renewables, supported by storage, networks and flexible demand, can put downward pressure on electricity costs. There is no single renewable percentage that guarantees every household’s bill will fall. A system can cost less than an alternative without every bill falling from today’s level.
What each study actually shows
CSIRO: Australia in 2050
For its Moderate Net Zero scenario, CSIRO’s data gives a 2050 system cost of A$141/MWh for the mature-technology grid and A$152.1/MWh for the grid with nuclear added. Both use the same emissions target and include generation, storage and new transmission. Values are in 2025 dollars.
The nuclear-inclusive case remains mostly renewable-led and includes two initial nuclear projects, providing about 5% of modelled generation. It compares two modelled electricity-system scenarios, not a nuclear-only grid against a renewable-only grid.
The individual large-scale nuclear plant LCOE range is A$183–323/MWh. The separate “Australia: build an estimate from CSIRO inputs” option combines its midpoint of A$253/MWh with assumptions entered by the reader. No nuclear total appears until all three extra costs are supplied. That illustration is not a matched CSIRO system-model result and does not establish equal reliability.
The NEM model excludes Western Australia and the Northern Territory. These system estimates do not include all distribution and retail costs and are not household retail prices. The nuclear projects include first-of-a-kind cost premiums.
Why did CSIRO say nuclear could cost 1.5 to 2.5 times more?
In 2024, CSIRO said large-scale nuclear generation could cost 1.5 to 2.5 times as much as firmed renewables under that report’s assumptions. That compared nuclear generation with firmed renewable generation; it was not the cost of a nuclear-only electricity system. Read CSIRO’s 2024 explanation.
The 2025–26 comparison above asks a different question: how does adding two nuclear projects affect the average cost across a mostly renewable grid? Because nuclear provides about 5% of generation in that model, its grid-wide average is not the price of nuclear power itself.
Lund and colleagues: Denmark’s future system
The peer-reviewed paper models a climate-neutral, sector-integrated Danish energy system. Its Figure 4 indicates approximately €45/MWh for the least-cost offshore wind and solar mix and approximately €100/MWh for nuclear. These are estimated technology or mix costs plus associated system-integration costs, not CSIRO-style averages for a whole electricity system. The renewable reading includes the small negative component shown below zero. Both figures are approximate readings from the graph, not exact table values.
The framework considers backup, transmission and other integration needs, alongside flexible demand and connections to heating, transport and industry. Its transmission costs are measured as additions relative to the nuclear benchmark; zero extra transmission for nuclear in the paper is not a claim that its entire grid costs nothing.
Its main calculations use European cost assumptions from the IEA’s 2023 outlook; the paper also tests other assumptions, including a lower nuclear financing-cost case. The main input costs are expressed around 2020–2022 price levels. Its electricity-only case produces different results.
Can I compare the Australian and Danish prices directly?
No. CSIRO estimates an average cost across a modelled electricity system. Lund estimates the cost of a technology or mix plus its associated system-integration costs in a different, sector-coupled energy system. They also use different assumptions, currencies and price years. An exchange-rate conversion would not make the measures equivalent.
Lund’s paper was published in June 2026, before the final GenCost report in July 2026. The difference between their figures does not demonstrate how Australian solar, wind or battery costs changed after GenCost.
How do financing assumptions differ?
Financing is one reason results may differ. GenCost’s individual-technology LCOE calculations use a 7% real discount rate for all technologies. Lund’s model uses 5%, with a higher nuclear capital cost to represent an 8% nuclear rate; it also tests a lower nuclear financing-cost case.
Those choices can affect relative costs, but the studies also differ in location, technology costs, lifetimes, system design and method. The financing difference alone does not establish that either study favours a technology overall. CSIRO’s nuclear-inclusive scenario also includes first-of-a-kind project premiums.
Does changing a number reproduce the studies’ models?
No. Changing a baseline or adding a per-MWh adjustment changes a simple arithmetic scenario. It does not re-optimise generation, storage or transmission and cannot establish whether a changed system remains reliable. Avoid double counting: both CSIRO system baselines and both Danish baselines already include modelled system costs. The separate CSIRO plant-cost baseline does not.
Sources & resourcesClick to collapse ↑
Reports, data, assumptions and supporting research used on this page.
Read the full CSIRO report · CSIRO GenCost report page · CSIRO data tables · CSIRO: the 2024 nuclear cost comparisonJuly 2026. CSIRO and AEMO report informed by public stakeholder consultation. System comparison: Final appendix workbook, “SLCOE Summary Results”, Moderate Net Zero, mature technology and +Nuclear columns. Nuclear share: sum of nuclear generation divided by total generation, rows 103–105. Report: Figure 5-5, page 61; nuclear plant costs: Appendix Table B.10, page 80. Figures are 2025 Australian dollars.
Read the paper on EV Curve Futurist · Original publicationPeer-reviewed journal article in Energy, volume 353, June 2026, article 140880. Denmark future-system figures are approximate readings from Figure 4. © 2026 The Authors. Licensed CC BY 4.0.
IRENA: renewable power costs · IEA: battery storage costs · IEA: nuclear project risksIRENA and the IEA report global technology costs and project risks; the CSIRO report above provides the Australian cost estimates. Past trends do not guarantee future costs, and this calculator does not model the cost of delays.
AEMO: how the NEM works · AEMC: price setting · AER: bill components · AER: 2025 wholesale market · AEMC: 2025 price outlookSources explain market dispatch, the components of retail prices and how renewable generation and storage influence wholesale prices. The AEMC outlook is a modelled scenario, not a guarantee of future bills.
Explore CSIRO’s Simple Electricity ModelFor detailed system modelling, consult the original assumptions and modelling tools rather than treating the simplified calculator as a forecast.